Flexible job-shop scheduling with routing flexibility and separable setup times using ant colony optimisation method A Rossi, G Dini Robotics and Computer-Integrated Manufacturing 23 (5), 503-516, 2007 | 227 | 2007 |
Flexible job shop scheduling with sequence-dependent setup and transportation times by ant colony with reinforced pheromone relationships A Rossi International Journal of Production Economics 153, 253-267, 2014 | 111 | 2014 |
Dynamic scheduling of FMS using a real-time genetic algorithm A Rossi, G Dini International Journal of Production Research 38 (1), 1-20, 2000 | 106 | 2000 |
Fast genetic algorithm for roundness evaluation by the minimum zone tolerance (MZT) method A Rossi, M Antonetti, M Barloscio, M Lanzetta Measurement 44 (7), 1243-1252, 2011 | 78 | 2011 |
A hybrid heuristic to solve the parallel machines job-shop scheduling problem A Rossi, E Boschi Advances in Engineering Software 40 (2), 118-127, 2009 | 60 | 2009 |
Embedded smart sensor device in construction site machinery A Rossi, Y Vila, F Lusiani, L Barsotti, L Sani, P Ceccarelli, M Lanzetta Computers in Industry 108, 12-20, 2019 | 42 | 2019 |
Heuristics for scheduling a two-stage hybrid flow shop with parallel batching machines: application at a hospital sterilisation plant A Rossi, A Puppato, M Lanzetta International Journal of Production Research 51 (8), 2363-2376, 2013 | 42 | 2013 |
Integration of hybrid additive/subtractive manufacturing planning and scheduling by metaheuristics A Rossi, M Lanzetta Computers & Industrial Engineering 144, 106428, 2020 | 40 | 2020 |
Scheduling flow lines with buffers by ant colony digraph A Rossi, M Lanzetta Expert Systems with Applications 40 (9), 3328-3340, 2013 | 27 | 2013 |
Dynamic set-up rules for hybrid flow shop scheduling with parallel batching machines A Rossi, A Pandolfi, M Lanzetta International Journal of Production Research 52 (13), 3842-3857, 2014 | 22 | 2014 |
Minimum centroid neighborhood for minimum zone sphericity A Rossi, S Chiodi, M Lanzetta Precision Engineering 38 (2), 337-347, 2014 | 22 | 2014 |
Optimal blind sampling strategy for minimum zone roundness evaluation by metaheuristics A Rossi, M Lanzetta Precision Engineering 37 (2), 241-247, 2013 | 22 | 2013 |
A form of deviation-based method for coordinate measuring machine sampling optimization in an assessment of roundness A Rossi Proceedings of the Institution of Mechanical Engineers, Part B: Journal of …, 2001 | 22 | 2001 |
Native metaheuristics for non-permutation flowshop scheduling A Rossi, M Lanzetta Journal of Intelligent Manufacturing 25 (6), 1221-1233, 2014 | 21 | 2014 |
Optimum dataset size and search space for minimum zone roundness evaluation by genetic algorithm A Meo, L Profumo, A Rossi, M Lanzetta Measurement Science Review 13 (3), 100-107, 2013 | 21 | 2013 |
Hybrid stage shop scheduling A Rossi, S Soldani, M Lanzetta Expert Systems with Applications 42 (8), 4105-4119, 2015 | 19 | 2015 |
Roundness: a closed form upper bound for the centroid to minimum zone center distance by worst-case analysis A Rossi, M Lanzetta Measurement 46 (7), 2251-2258, 2013 | 13 | 2013 |
Lean maturity assessment in eto scenario M Chiera, F Lupi, A Rossi, M Lanzetta Applied Sciences 11 (9), 3833, 2021 | 11 | 2021 |
An evolutionary approach to complex job-shop and flexible manufacturing system scheduling A Rossi, G Dini Proceedings of the Institution of Mechanical Engineers, Part B: Journal of …, 2001 | 11 | 2001 |
Influence of cross-sectional geometry on mixing in a T-shaped micro-junction A Mariotti, M Lanzetta, G Dini, A Rossi, E Brunazzi, R Mauri, C Galletti Chemical Engineering Transactions 74, 955-960, 2019 | 10 | 2019 |