Follow
Bhupesh Kumar Lad
Bhupesh Kumar Lad
Verified email at iiti.ac.in - Homepage
Title
Cited by
Cited by
Year
Distributed maintenance planning in manufacturing industries
K Upasani, M Bakshi, V Pandhare, BK Lad
Computers & Industrial Engineering 108, 1-14, 2017
902017
Multiple failure behaviors identification and remaining useful life prediction of ball bearings
P Kundu, S Chopra, BK Lad
Journal of Intelligent Manufacturing 30, 1795-1807, 2019
552019
A novel integrated tool condition monitoring system
AK Jain, BK Lad
Journal of Intelligent Manufacturing 30 (3), 1423-1436, 2019
532019
Optimal maintenance schedule decisions for machine tools considering the user's cost structure
BK Lad, MS Kulkarni
International Journal of Production Research 50 (20), 5859-5871, 2012
522012
A parameter estimation method for machine tool reliability analysis using expert judgement
BK Lad, MS Kulkarni
International journal of data analysis techniques and strategies 2 (2), 155-169, 2010
492010
A multi agent system architecture to implement collaborative learning for social industrial assets
K Bakliwal, MH Dhada, AS Palau, AK Parlikad, BK Lad
IFAC-PapersOnLine 51 (11), 1237-1242, 2018
452018
Integrated reliability and optimal maintenance schedule design: a life cycle cost based approach
BK Lad, MS Kulkarni
International Journal of Product Lifecycle Management 3 (1), 78-90, 2008
412008
Investigating the value of integrated operations planning: A case-based approach from automotive industry
S Kumar, BS Purohit, V Manjrekar, V Singh, BK Lad
International Journal of Production Research 56 (22), 6971-6992, 2018
382018
Integrated yet distributed operations planning approach: A next generation manufacturing planning system
S Kumar, V Manjrekar, V Singh, BK Lad
Journal of Manufacturing Systems 54, 103-122, 2020
312020
Production and maintenance planning: an integrated approach under uncertainties
BS Purohit, B Kumar Lad
The International Journal of Advanced Manufacturing Technology 86, 3179-3191, 2016
292016
Predicting remaining useful life of high speed milling cutters based on artificial neural network
AK Jain, BK Lad
2015 International Conference on Robotics, Automation, Control and Embedded …, 2015
262015
Optimal reliability design of a system
BK Lad, MS Kulkarni, KB Misra
Handbook of performability engineering, 499-519, 2008
252008
Integrated production and maintenance planning for parallel machine system considering cost of rejection
S Kumar, BK Lad
Journal of the Operational Research Society 68, 834-846, 2017
222017
Dynamic optimization of process quality control and maintenance planning
AK Jain, BK Lad
IEEE Transactions on Reliability 66 (2), 502-517, 2017
202017
Reliability and maintenance based design of machine tools
BK LAD, MS KULKARNI
International Journal of Performability Engineering 9 (3), 321, 2013
182013
Simultaneous selection of reliability design and level of repair for fleet systems
M Rawat, BK Lad
International Journal of System Assurance Engineering and Management 7, 138-155, 2016
162016
Blockchain enabled maintenance management framework for military equipment
RS Mohril, BS Solanki, BK Lad, MS Kulkarni
IEEE Transactions on Engineering Management 69 (6), 3938-3951, 2021
142021
A quantum‐based diagnostics approach for additive manufacturing machine
V Sharma, S Gupta, G Mehta, BK Lad
IET Collaborative Intelligent Manufacturing 3 (2), 184-192, 2021
142021
Novel approach for machine tool maintenance modelling and optimization using fleet system architecture
M Rawat, BK Lad
Computers & Industrial Engineering 126, 47-62, 2018
142018
Prediction of remaining useful life of an aircraft engine under unknown initial wear
AK Jain, P Kundu, BK Lad
5th international & 26th all India manufacturing technology, design and …, 2014
142014
The system can't perform the operation now. Try again later.
Articles 1–20