Follow
Lixin Tang
Lixin Tang
Key Laboratory of Data Analytics and Optimization for Smart Industry (Northeastern University
Verified email at mail.neu.edu.cn - Homepage
Title
Cited by
Cited by
Year
A review of planning and scheduling systems and methods for integrated steel production
L Tang, J Liu, A Rong, Z Yang
European Journal of operational research 133 (1), 1-20, 2001
5342001
A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron & Steel Complex
L Tang, J Liu, A Rong, Z Yang
European Journal of Operational Research 124 (2), 267-282, 2000
5092000
A mathematical programming model for scheduling steelmaking-continuous casting production
L Tang, J Liu, A Rong, Z Yang
European Journal of Operational Research 120 (2), 423-435, 2000
3412000
Differential evolution with an individual-dependent mechanism
L Tang, Y Dong, J Liu
IEEE Transactions on Evolutionary Computation 19 (4), 560-574, 2014
2992014
An improved differential evolution algorithm for practical dynamic scheduling in steelmaking-continuous casting production
L Tang, Y Zhao, J Liu
IEEE Transactions on Evolutionary Computation 18 (2), 209-225, 2013
2892013
Steel-making process scheduling using Lagrangian relaxation
L Tang, PB Luh, J Liu, L Fang
International Journal of Production Research 40 (1), 55-70, 2002
2852002
A hybrid multiobjective evolutionary algorithm for multiobjective optimization problems
L Tang, X Wang
IEEE Transactions on Evolutionary Computation 17 (1), 20-45, 2012
1912012
Scheduling a hybrid flowshop with batch production at the last stage
H Xuan, L Tang
Computers & operations research 34 (9), 2718-2733, 2007
1632007
Modeling and solution of the joint quay crane and truck scheduling problem
L Tang, J Zhao, J Liu
European Journal of Operational Research 236 (3), 978-990, 2014
1352014
A two-stage flow shop scheduling problem on a batching machine and a discrete machine with blocking and shared setup times
H Gong, L Tang, CW Duin
Computers & Operations Research 37 (5), 960-969, 2010
1272010
A new hybrid ant colony optimization algorithm for the vehicle routing problem
X Zhang, L Tang
Pattern Recognition Letters 30 (9), 848-855, 2009
1252009
A neural network model and algorithm for the hybrid flow shop scheduling problem in a dynamic environment
L Tang, W Liu, J Liu
Journal of Intelligent Manufacturing 16 (3), 361-370, 2005
1202005
A multi-objective model for purchasing of bulk raw materials of a large-scale integrated steel plant
Z Gao, L Tang
International Journal of Production Economics 83 (3), 325-334, 2003
1202003
A new Lagrangian relaxation algorithm for hybrid flowshop scheduling to minimize total weighted completion time
L Tang, H Xuan, J Liu
Computers & Operations Research 33 (11), 3344-3359, 2006
1162006
Decision support system for the batching problems of steelmaking and continuous-casting production
L Tang, G Wang
Omega 36 (6), 976-991, 2008
1112008
Iterated local search algorithm based on very large-scale neighborhood for prize-collecting vehicle routing problem
L Tang, X Wang
The International Journal of Advanced Manufacturing Technology 29 (11-12 …, 2006
1102006
A tabu search heuristic for the hybrid flowshop scheduling with finite intermediate buffers
X Wang, L Tang
Computers & Operations Research 36 (3), 907-918, 2009
1062009
Modelling and a genetic algorithm solution for the slab stack shuffling problem when implementing steel rolling schedules
L Tang, J Liu, A Rong, Z Yang
International Journal of Production Research 40 (7), 1583-1595, 2002
1022002
An improved Benders decomposition algorithm for the logistics facility location problem with capacity expansions
L Tang, W Jiang, GKD Saharidis
Annals of operations research 210 (1), 165-190, 2013
982013
A discrete particle swarm optimization algorithm with self-adaptive diversity control for the permutation flowshop problem with blocking
X Wang, L Tang
Applied Soft Computing 12 (2), 652-662, 2012
962012
The system can't perform the operation now. Try again later.
Articles 1–20