Folgen
Omid Alizadeh-Mousavi
Omid Alizadeh-Mousavi
Engineer and Scientist in Electrical Engineering
Bestätigte E-Mail-Adresse bei krakenflex.com
Titel
Zitiert von
Zitiert von
Jahr
Digital twin of distribution power transformer for real-time monitoring of medium voltage from low voltage measurements
P Moutis, O Alizadeh-Mousavi
IEEE Transactions on Power Delivery 36 (4), 1952-1963, 2020
1112020
Security Constrained Unit Commitment With Dynamic Thermal Line Rating
M Nick, O Alizadeh-Mousavi, R Cherkaoui, M Paolone
IEEE, 2015
1102015
Co-optimization of transmission expansion planning and TCSC placement considering the correlation between wind and demand scenarios
O Ziaee, O Alizadeh-Mousavi, F Choobineh
IEEE Transactions on Power Systems, 2017
842017
Preventive reactive power management for improving voltage stability margin
OA Mousavi, M Bozorg, R Cherkaoui
Electric Power Systems Research 96, 36-46, 2013
732013
Literature survey on fundamental issues of voltage and reactive power control
OA Mousavi, R Cherkaoui
Ecole Polytechnique Fédérale de Lausanne: Lausanne, Switzerland, 2011
722011
Blackouts risk evaluation by Monte Carlo Simulation regarding cascading outages and system frequency deviation
OA Mousavi, R Cherkaoui, M Bozorg
Electric Power Systems Research 89, 157-164, 2012
552012
Efficient Benders cuts for transmission expansion planning
O Alizadeh-Mousavi, M Zima-Bočkarjova
Electric Power Systems Research 131, 275-284, 2016
372016
Inter-area frequency control reserve assessment regarding dynamics of cascading outages and blackouts
OA Mousavi, M Bozorg, R Cherkaoui, M Paolone
Electric power systems research 107, 144-152, 2014
322014
Reactive power reserve management: Preventive countermeasure for improving voltage stability margin
OA Mousavi, M Bozorg, A Ahmadi-Khatir, R Cherkaoui
Power and Energy Society General Meeting, 2012 IEEE, 1-7, 2012
292012
Assessing the risk of blackout in the power system including HVDC and FACTS devices
MJ Sanjari, O Alizadeh Mousavi, GB Gharehpetian
International Transactions on Electrical Energy Systems 23 (1), 109-121, 2013
272013
Maximum Voltage Stability Margin Problem With Complementarity Constraints for Multi-Area Power Systems
O Alizadeh Mousavi, R Cherkaoui
IEEE Transactions on Power Systems 29 (6), 2993 - 3002, 2014
262014
Integration of Transmission Lines Dynamic Thermal rating into real-time Optimal dispatching of power systems
M Nick, OA Mousavi, R Cherkaoui, M Paolone
2015 50th International Universities Power Engineering Conference (UPEC), 1-6, 2015
232015
Investigation of P–V and V–Q based optimization methods for voltage and reactive power analysis
OA Mousavi, R Cherkaoui
International Journal of Electrical Power & Energy Systems 63, 769-778, 2014
222014
Assessment of HVDC grid segmentation for reducing the risk of cascading outages and blackouts
OA Mousavi, L Bizumic, R Cherkaoui
2013 IREP Symposium Bulk Power System Dynamics and Control-IX Optimization …, 2013
222013
On the inter-area optimal voltage and reactive power control
OA Mousavi, R Cherkaoui
International Journal of Electrical Power & Energy Systems 52, 1-13, 2013
212013
Stochastic security constrained unit commitment with variable-speed pumped-storage hydropower plants
O Alizadeh-Mousavi, M Nick
2016 Power Systems Computation Conference (PSCC), 1-7, 2016
172016
Low voltage grid monitoring and control enhancement: The grideye solution
M Carpita, A Dassatti, M Bozorg, J Jaton, S Reynaud, OA Mousavi
2019 International Conference on Clean Electrical Power (ICCEP), 94-99, 2019
162019
A simple and unified method to model HVDC links and FACTS devices in DC load flow
OA Mousavi, MJ Sanjari, GB Gharehpetian, RA Naghizadeh
Simulation 85 (2), 101-109, 2009
132009
Anti-islanding protection of distributed generation resources using negative sequence component of voltage
A Helmzadeh, J Sadeh, O Alizadeh Mousavi
International Conference on Power Engineering, Energy and Electrical Drives, 2007
122007
Mixed integer ink selection for spectral reproduction
N Ansari, O Alizadeh-Mousavi, HP Seidel, V Babaei
ACM Transactions on Graphics (TOG) 39 (6), 1-16, 2020
92020
Das System kann den Vorgang jetzt nicht ausführen. Versuchen Sie es später erneut.
Artikel 1–20