Measurement and estimation of traffic oscillation properties X Li, F Peng, Y Ouyang Transportation Research Part B: Methodological 44 (1), 1-14, 2010 | 146 | 2010 |
A heuristic approach to the railroad track maintenance scheduling problem F Peng, S Kang, X Li, Y Ouyang, K Somani, D Acharya Computer‐Aided Civil and Infrastructure Engineering 26 (2), 129-145, 2011 | 140 | 2011 |
Bridge seismic retrofit program planning to maximize postearthquake transportation network capacity L Chang, F Peng, Y Ouyang, AS Elnashai, BF Spencer Jr Journal of Infrastructure Systems 18 (2), 75-88, 2012 | 139 | 2012 |
Optimal clustering of railroad track maintenance jobs F Peng, Y Ouyang Computer‐Aided Civil and Infrastructure Engineering 29 (4), 235-247, 2014 | 91 | 2014 |
Track maintenance production team scheduling in railroad networks F Peng, Y Ouyang Transportation Research Part B: Methodological 46 (10), 1474-1488, 2012 | 78 | 2012 |
A supporting station model for reliable infrastructure location design under interdependent disruptions X Li, Y Ouyang, F Peng Transportation Research Part E: Logistics and Transportation Review 60, 80-93, 2013 | 73 | 2013 |
Optimal routing and scheduling of periodic inspections in large-scale railroad networks F Peng, Y Ouyang, K Somani Journal of Rail Transport Planning & Management 3 (4), 163-171, 2013 | 52 | 2013 |
Effects of Disruption Risks on Biorefinery Location Design Y Bai, X Li, F Peng, X Wang, Y Ouyang Energies 8 (2), 1468-1486, 2015 | 51 | 2015 |
Scheduling of track inspection and maintenance activities in railroad networks F Peng University of Illinois at Urbana-Champaign, 2011 | 40 | 2011 |
Network Routing of Snowplow Trucks with Resource Replenishment and Plowing Priorities: Formulation, Algorithm, and Application L Hajibabai, S Nourbakhsh, Y Ouyang, F Peng Transportation Research Record: Journal of the Transportation Research Board …, 2014 | 28 | 2014 |
Effects of disruption risks on biorefinery location design: discrete and continuous models X Li, F Peng, Y Bai, Y Ouyang Transportation Research Board 90th Annual Meeting, 2011 | 20 | 2011 |
Approximation of discrete spatial data for continuous facility location design F Peng, X Wang, Y Ouyang Integrated Computer-Aided Engineering 21 (4), 311-320, 2014 | 19 | 2014 |
Integrated decision support for roadway safety analysis JH Jo, JS Lee, Y Ouyang, F Peng Journal of Computing in Civil Engineering 25 (1), 50-56, 2010 | 18 | 2010 |
Pavement program planning based on multi-year cost-effectiveness analysis F Peng, Y Ouyang Federal Highway Administration, 2010 | 9* | 2010 |
Installation of railroad wayside defect detectors: multiperiod design F Peng, X Li, Y Ouyang Transportation Research Record: Journal of the Transportation Research Board …, 2011 | 8* | 2011 |
Formulation and Algorithms for Discrete Minimum-Cost Group Assembly Problem F Peng, T Hwang, Y Ouyang Transportation Research Record: Journal of the Transportation Research Board …, 2013 | 3 | 2013 |
Snowplow Routing Optimization Under Resource Constraints: Formulation, Algorithm, and Decision-Support System L Hajibabai, SM Nourbakhsh, Y Ouyang, F Peng Transportation Research Board 92nd Annual Meeting, 2013 | 3 | 2013 |
The Discrete Minimum-Cost Group Assembly Problem F Peng, T Hwang, Y Ouyang Transportation Research Board 90th Annual Meeting, 2011 | 3* | 2011 |
Continuumization and approximation of discrete spatial data for optimal facility location design F Peng, Y Ouyang, X Wang Transportation Research Board 92nd Annual Meeting, 2013 | 2* | 2013 |
Production Team Scheduling in Railroad Networks F Peng, Y Ouyang Transportation Research Board 91st Annual Meeting, 2012 | 1 | 2012 |