Data-driven model for maintenance decision support: A case study of railway signalling systems A Morant, PO Larsson-Kråik, U Kumar Proceedings of the Institution of Mechanical Engineers, Part F: Journal of …, 2016 | 39 | 2016 |
Railway EMI impact on train operation and environment A Morant, Å Wisten, D Galar, U Kumar, S Niska Electromagnetic Compatibility (EMC EUROPE), 2012 International Symposium on, 1-7, 2012 | 29 | 2012 |
The measurement of maintenance function efficiency through financial KPIs D Galar, A Parida, U Kumar, D Baglee, A Morant Journal of Physics: Conference Series 364 (1), 012112, 2012 | 22* | 2012 |
Safety and availability evaluation of railway operation based on the state of signalling systems A Morant, A Gustafson, P Söderholm, PO Larsson-Kråik, U Kumar Proceedings of the Institution of Mechanical Engineers, Part F: Journal of …, 2017 | 18 | 2017 |
Desarrollo, implementación y seguimiento de la gestión de requerimientos y de la configuración en los proyectos embarcados ERTMS A Morant Estevan Universitat Politècnica de València UPV, 2011 | 13* | 2011 |
Cloud computing for maintenance of railway signalling systems A Morant, D Galar, J Tamarit Proceedings of The Ninth International Conference on Condition Monitoring …, 2012 | 11 | 2012 |
Safety and Availability Evaluation of Railway Signalling Systems A Morant, A Gustafson, P Söderholm Current Trends in Reliability, Availability, Maintainability and Safety, 303-316, 2016 | 8 | 2016 |
Dependability and Maintenance Analysis of Railway Signalling Systems A Morant Luleå University of Technology, 2014 | 8 | 2014 |
Integration of Production Data in CM for Non-stationary Machinery: A Data Fusion Approach D Galar, A Morant Condition Monitoring of Machinery in Non-Stationary Operations, 403-414, 2012 | 6 | 2012 |
Dependability improvement through configuration management : A study of railway signalling systems A Morant, R Karim, P Tretten, PO Larsson-Kråik International Journal of C O M A D E M 16 (4), 31-40, 2013 | 4 | 2013 |
Doctoral Thesis, Dependability and safety evaluation of railway signalling systems based on field data A Morant Luleå tekniska universitet, 2015 | 2 | 2015 |
O&M efficiency model: A dependability approach D Galar, U Kumar, P Sandborn, A Morant Journal of Physics: Conference Series 364 (1), 012111, 2012 | 2 | 2012 |
Knowledge management in a railway network: The case of signalling systems A Morant, M Westerberg, PO Larsson-Kråik Proceedings of The Second International Conference on Railway Technology …, 2014 | 1 | 2014 |
Information logistics for maintenance of railway signalling systems: A case study Morant, A., Karim, R., Larsson-Kråik, P-O. International Journal of Railway Technology 2 (2), 97-112, 2013 | 1 | 2013 |
Improvement of configuration management in railway signalling system A Morant, R Karim, P Tretten, D Galar Proceedings of the 2nd International Workshop & Congress on eMaintenance …, 2013 | | 2013 |
REPORT D. 3.1 and D3. 2 Drawbacks of Current Harmonised EMC Approval Tests & Other electromagnetic influences V Deniau, J Rodriguez, S Niska, D Galar, A Morant, Å Wisten, RA Adin | | 2012 |